El Centro Elementary School District
El Centro Elementary School District
De Anza Magnet School
Desert Garden School
Harding School
Hedrick School
Imperial Valley Home School Academy
Kennedy Middle School
Lincoln School
Martin Luther King School
McKinley School
Sunflower School
Washington School
Wilson Jr. High
View Original
Spanish
Cantonese
French
German
Italian
Tagalog
Vietnamese
Korean
Russian
Hindi
Guest
|
Login
El Centro Elementary
School District
{1}
##LOC[OK]##
Home
School Board
Online Board Agenda
Board Meeting Schedule
Board Policies
Archived Agendas
Archived Minutes
Archived Special Meetings
Schools
De Anza Magnet
Desert Garden Elementary
Harding Elementary
Hedrick Elementary
IV Home School Academy
Kennedy Middle School
Lincoln Elementary
ML King Elementary
McKinley Elementary
Sunflower Elementary
Washington Elementary
Wilson Jr. High
Annual SARCs
GAFE
Parents
Report Bullying
School Bucks
Ren Place Home Connect
AR Book Finder
CAASPP Info
Lunch Menu
Annual SARC
Supplemental Ed Services (SES)
Annual Parent Notification - English
Annual Parent Notification - Spanish
Personal Math Trainer (PMT) Guide
Transportation Release Form - English
Transportation Release Form - Spanish
Bus Routes
Common Sense Media
EveryoneOn.org
Field Trip Consent Form
Students
Report Bullying
AR Book Finder
Calendar
2015-16 District Calendar
2016-17 District Calendar
2017-18 District Calendar
Departments
Superintendent
School Board
Technology
Associate Superintendent
Special Education
Human Resources
Educational Services
Assistant Superintendent
MOT
Fiscal Services
Child Nutrition Services
Safe School Plans
Directory
LCAP Info
Links
ECESD 2015 LEA Plan/Title III Addendum Update
Renaissance Place
Synergy (SIS)
School Bucks
School Dude
SME Home
SST Online
Webmail
OARS
Bids
E-Rate Year 18
E-Rate Year 17
Facilities Master Plan
Skip Sidebar Navigation
E-Rate Year 18
E-Rate Year 17
Facilities Master Plan
Last item for navigation
E-Rate Year 18
El Centro Elementary School District
»
Links
»
Bids
»
E-Rate Year 18
E-Rate Year 18 Bid Documents
Wireless RFP
RFPY18_WIRELESS_01.pdf
AGREEMENT RFPY18_WIRELESS_#01.pdf
CMAS RFO
El Centro ESD YR 18 CMAS RFO Equipment.pdf
AGREEMENT El Centro ESD YR 18 CMAS RFO Equipment.pdf
Addendum (Updated: 02/20/2015)
El Centro ESD YR 18 CMAS RFO Equipment - 02-17-2015 ADDENDUM
El Centro ESD YR 18 CMAS RFO Equipment - 02202015 ADDENDUM
Forms (Updated: 02/12/2015)
Bidders Substitution Request Form
Q&A(Updated: 02/25/2015)
Q: ISP 470 - Is the district seeking fiber or DSL?
A: The district is seeking non-fiber solutions.
Q: ISP 470 - Is this service for cellular voice and/or data service requiring SIM card smart phone or tablet?
A: No. The district is seeking fixed ISP connectivity for schools.
Q: Caching 470 - What solution is the district seeking?
A: The district is accepting any and all solutions which provide Internet caching services.
Q: C2 - What are you currently using for your WLAN?
A: We're currently using Meraki APs.
Q: C2 - Is this a new project or expansion?
A: Expansion.
Q: C2 - How many buildings are you looking to install Wi-Fi in?
A: About 350 total.
Q: C2 - Any sort of initiatives (guest access, 1:1, BYOD)?
A: Currently, there are no formalized initiatives.
Q: C2 - Is there a specific bid or walk-through date?
A: Please contact us to schedule an appointment.
Q: C2 - Is there time for product demos?
A: Requests will be made to vendors if product demos are needed.
Q: ISP 470 - This this 470 issued to replace a contract coming to an end or is it to sustain E-rate funding for an existing contract?
A: The 470 is for new services.
Q: Caching - How saturated is the Internet connection?
A: On average, daily utilization ranges from 150-175 Mbps.
Q: Caching - Any other Internet connections at the district?
A: No.
Q: Caching - What is the throughput at the elementary schools?
A: 11 of 12 schools connect back to datacenter (ISP) at 10GB.
Q: Caching - It looks like you're looking for a caching solution deployed at your DO only, correct?
A: It depends. The DO serves as the datacenter and ISP for schools. If the technology solution fits that topology, then the answer is yes.
Q: Caching - When will you need support for 10GB?
A: Our road map calls for upgrading to 10GB by Dec 2015 (from firewall to ISP).
Q: Caching - How many websites do you plan to cache at any given time?
A: As many as possible.
Q: Caching - How many students/endpoints will this solution be supporting?
A: Initially, 2000. With plans to double it every year, for three years.
Q: Caching - What sites/updates are you looking to cache?
A: GAFE, Office 365, SBAC Testing, SBAC web resources.
Q: C2 - Would you like to standardize to a 48-port full POE switch like the WS-C2960? (The stacking modules would not be included unless requested)
A: Please review the ECESD Wired Inventory located in the section below. We would like to standardize to 48-port full or half POE at every MDF/IDF, using stacking modules if multiple switches reside in the same cabinet, with the exception of Kinder locations. Kinder locations only need 24-port full POE switches.
Q: C2 - Do we require a new switch for each MDF and IDF location?
A: With the exception of the Cisco 4500x's, we would like to standardize to new MDF and IDF switches.
Q: C2 - Should the proposal include 10G optics for the core and the edge?
A: Yes. The proposal should include single mode 10G optics for the core and the edge.
Site Maps & MDF/IDF Info (Updated: 02/20/15)
El Centro ESD Site Maps.pdf
ECESD Wired Network Inventory and port counts